the team arrived at about 8;15 and finished about 4;00 , one day very impressed . they had to take out a old tub that had been there almost 40 years then they had to reframe the floor to level . After that it was pretty straight forward in doing the replumbing and covering up some holes I'd made after that the floor pan went down the walls went up and the fixtures went in including the bench seat . Over all the team who installed the tub to shower conversion did a great job . Thanks again Scott uhrich