David and his representatives did a very professional and timely renovation of our master bath. First was the excellent removal of a Jacuzzi 2 person bath and a separate shower while leaving a very clean bathroom. Next was the construction of the behind the surface walls and plumbing. Third came the installation of the flooring, walls, window framing, and plumbing fixtures. Seeing this completed stage ensured us that we had made the right decision when choosing David to perform this project for us. The final stage was the installation of the glass wall and door which fit perfectly. Our new shower is now 5 feet by five feet and contains 2 shower heads, 3 hand rails, 2 trays, and 4 foot by 4 foot window. We are extremely pleased with the work and finished product.